The Federal Government has revised the Lagos-Calabar Coastal Highway project, reducing its scope from ten lanes to six. Minister of Works, Senator David Umahi, disclosed this during an inspection tour on Friday, citing necessary design adjustments and interventions as the reason for the change.
Explaining the revision, Umahi highlighted challenges such as the removal of refuse buried up to ten meters deep and the subsequent backfilling operations. These complexities, along with other technical considerations, prompted the government to streamline the project’s scope while retaining its functionality.
President Bola Tinubu’s support was instrumental in salvaging existing structures along the route, Umahi noted. He also revealed plans to include service lanes for better accessibility to local communities, enhancing the road’s utility for residents.
The updated highway design will feature solar-powered streetlights with integrated security cameras, safety points, and tree-lined sections to enhance safety and aesthetics. These features aim to improve motorist experience and community integration along the 750-kilometer stretch.
Senator Umahi announced that 20 kilometers of the highway’s first section would be ready for inauguration by May 29, 2026. The project, once completed, is expected to boost Nigeria’s road network, enhance transportation efficiency, and promote sustainable development.
Akoni TV For your Socio-Politcial, Business, Sport and Entertainment News